2022
OFFSHORE PIPING PERSONNEL PROTECTION
Offshore Piping Personnel Protection for DESB and Repsol by EMNES.
PSL1 & PSL2 PIPES
PSL1 & PSL2 pipes ready for delivery.
DELIVERY OF HARDWOOD TIMBERS
Delivery of Hardwood Timbers – mudmat installation for Hess Corporation Phase 4A.
SITE ACCEPTANCE TEST (SAT) with PETRONAS
Site acceptance test (SAT) with PETRONAS for replacement of foam bladder tanks 3,000liters, 9,000liters and 14,000liters.
DELIVERY OF STEEL PLATES
Delivery of steel plates S275/S355 for Samsung C&T Corporation UEM Construction JV.
DELIVERY PIPES.
Delivery of 2” and 3” ss304/304l pipes.
DELIVERY OF CET SINGLE TOTE FOAM AND TRAINING DAY WITH PETRONAS
Delivery of cet single tote foam and training day with PETRONAS.
INSULATION PIPING CAGE FABRICATED
Insulation piping cage fabricated and off it goes to Labuan for Repsol KNDW-D & KNDP-A projects.
CONSULT, DESIGN, SUPPLY, DELIVERY, INSTALL, TESTING & COMMISSIONING STEEL STRUCTURE PLATFORM
To consult, design, supply, delivery, install, testing & commissioning steel structure platform For Animal Feed Production Line And Its associated Equipments At Kilang Makanan Ternakan Fgvif Kapar Klang
YEARLY MAINTENANCE CHECK
Yearly maintenance check for foam bladder tanks.
PROVISION OF FABRICATION AND ASSEMBLY WORKS
Provision of fabrication and assembly works for 8unit gas metering skids – Titanium
BLASTING & PAINTING WORK
Static mixers undergoing blasting & painting work before delivery for EMAS project.
FIREMAN LOCKERS FABRICATED AND DELIVERED
6 units of fireman lockers fabricated and delivered for EPOMS by Emnes Metal Sdn Bhd.
REFURBISHMENT
Refurbishment of Rescue Model (Smoke House).
INSTALLATION
Installation of front and back gates fabricated for PR1MA Homes in Sg Petani 1, 2 and Padang Meha.
MACKINTOSH PROBE-TEST, FABRICATION AND INSTALLATION
Mackintosh probe-test, fabrication and installation of shelter waste yard at FTG, CEFS Response, Paka, Terengganu
STRUCTURAL TIMBER
Structural timber (Batch 2 of 5) delivery and unloading for Sapura Energy Berhad and Hess Corporation – our contribution to the EPCC Full Field Development Phase 4A Facilities, North Malay Basin
REPAIR WORKS
Repair works for cold applied wrapping after damages from lifting for HRSB Holdings Sdn Bhd Effluent Management at Source Project, Melaka REPAIR WORKS
FOAM BLADDER TANK REFURBISHMENT
LUBE OIL FLUSHING D-18
REPAIR ROLLER SHUTTER AT STATION A’S BAY
PROJECT: Repair Roller Shutter at Station A’s Bay
CLIENT: CEFS Response
PROVIDE INTERNAL TANK RECOATING SERVICES WORKS FOR 1 UNIT AERATED TANK & 1 UNIT ANOTOXIC TANK
PROJECT: ABF Bintulu Turnaround 2022
CLIENT: Olio Resources Sdn Bhd
SUPPLY & DELIVERY OF MUDMAT TIMBER
PROJECT: Supply & Delivery of Mudmat Timber – Keruing – For Hess Phase 4A, North Malay Basin
CLIENT: Sapura Fabrication Sdn Bhd
CONSULT, DESIGN, SUPPLY, DELIVERY, INSTALL & TESTING, COMMISSIONING STEEL STRUCTURE PLATFORM FOR ANIMAL FEED PRODUCTION LINE AND ITS ASSOCIATED EQUIPMENTS
PROJECT: Steel Structure Platform for Animal Feed Production Line
CLIENT: FGV Integrated Farming Sdn Bhd
FABRICATION SKID
PROJECT: Supply of Metering Skids for Titanium NBL Outside Battery Limit (N-OSBL), Pengerang (Titanium Project)
CLIENT: Khrone Malaysia
WASTE SHELTER YARD
PROJECT: To Construct Waste Shelter Yard at Fire Training Ground
CLIENT: CEFS Response
SUPPLY & DELIVERY OF MAJOR GAS PIPELINE (CARBON STEEL & STAINLESS STEEL PIPES & FITTINGS)
PROJECT: Harum Manis – Kerteh Terminal Sdn Bhd
CLIENT: Steel Hawk Berhad